Friday, January 14, 2005
Sunday, December 19, 2004

Gema and I duck hunted on the Colorado river a few times this season. She performed beyond my expectaions, she has great genes. This was Gema's first duck, she lept off the ice shelf into the icy river like it was no big deal. I had already tested the ice shelf before I sent her out because I knew I had to grab her to get her out of the river. After that, I found some shelter along the canyon wall, dried her off with snow, and took this pic.
The terrain we hunted was in the tight South Canyon shared by I-70, the railroad, and the Colorado river. The hunt is a walk down the tracks in the narrow South Canyon - shooting towards the interstate - lol. It was pretty cold walking around in 2' of snow with trains roaring past me. The wind and rush of the river, plus the noise dampening of the snow really muffled the sound of the trains (especially the Amtracks), most engineers would sound thier horns a couple times to let me know they were on their way.
I started using steel shot and quickly figured out it doesn't work. I watch the bb mass go right through the duck and didn't phase it, weird. Can't use lead these days so I went into town and bought some heavishot- $23 for 10 shells. It's still some kind of steel so I had to stick with the modified choke. I now use Bismuth shot exclusively.
Wednesday, December 15, 2004
Monday, November 01, 2004
Friday, September 24, 2004
Monday, August 23, 2004
Tuesday, August 17, 2004
Monday, August 09, 2004
Monday, July 19, 2004
Irrigation or is it Irritation.
Working here on installing the PRV, anti siphon, and the zone 1 valve. The pit meter is behind and to the left, already installed. The picture that got away will forever live in our memories. The story is now a week old the emotion has worn off. On Saturday, July 9, I set out on a project to remove the water meter from our mechanical room so I could relocate to a street-side pit, all in the name of irrigation. The removal went well although I couldn't sweat a copper joint to save my life. I tried twice to assemble the plumbing necessary to replace the void of the water meter, each time resulting in one or two pin hole leaks. I decided to stop the work that evening after running out of supplies. Sunday started out with a nice breakfast and a trip to Tim's Tools in Silt where I picked up 2 of everything. I arrived home and told Delle that I could do this in one shot, and I did do it in one shot - with a rain delay. As I was sweating one of the joints the compression fitting popped off the main line and we had a 100psi water feature inside the house. It turns out that our plumber failed to include a crucial part when he attached the brass compression fitting to the poly main line. The crucial part is called a stiffener and it is a short, thin stainless steel pipe that is inserted into the end of the poly to give the compression fitting a solid surface to compress upon. A responsible plumber is what we didn't have. Luckily there was a man working at the water plant located two miles away and we only had to battle the cold barrage for 30 minutes. Lesson learned: ask us who not to use for a plumber, always turn the water off before a major plumbing project.
















